To Remove:
- Disconnect the negative battery cable.
- Place the vehicle on a hoist to raise it.
- Disconnect the wire at the sender.
- Remove the oil pressure sender.
NOTE: Apply pipe sealant with TeflonŽ onto the sender threads.
To Install:
NOTE: Apply pipe sealant with TeflonŽ onto the sender threads.
- Install the oil pressure sender. Torque to 13 ft-lb (18 Nm).
- Connect the wire at the sender.
- Lower the vehicle.
- Connect the negative battery cable.