![Next](next.gif)
- Disconnect the negative battery cable. Drain the cooling system.
- Disconnect the hoses from the air pump and remove the air pump from the
engine.
- Loosen the hose clamps, then disconnect the funnel and air hose from the
air cleaner and the turbocharger. Remove the air funnel and air hose from
the engine.
- Disengage the connector from the air control valve and remove the valve
from the engine.
- Disconnect the split air pipe from the engine and remove the pipe, along
with the gasket.
- Disconnect and remove the water hose and water pipe from the engine.
- Disconnect the supply and return oil pipes from the turbocharger. (There
may be some oil left in the lines, so be prepared to collect any residual
oil with a small plastic container. Be sure to cover the openings to protect
the system.)
- Remove the front converter insulator covers and disconnect the front converter
from the turbocharger. Remove and discard the old gasket.
- Unstake the retainer tabs from the retainer plate with a small prying tool.
Remove the nuts and washers that secure the turbocharger to the exhaust manifold
studs, then remove the turbocharger from the engine. Immediately cover all
the turbo openings to prevent the entry of dirt and foreign matter. Remove
and discard the old turbocharger gasket.
- Remove the insulator covers from the exhaust manifold. Loosen and remove
the exhaust manifold retaining nuts/lockwashers.
- Remove the exhaust manifold and waste gate actuator assembly from the engine.
Remove the gasket and discard it.
- Thoroughly clean the exhaust manifold and turbocharger contact surfaces,
then check the exhaust manifold for warpage with a metal straightedge.
To install:
- Place a new manifold gasket onto the engine. Install the exhaust manifold/actuator
assembly over the mounting studs and position it flush with the gasket. Install
the lockwashers and mounting nuts, then torque them to 23–34 ft. lbs.
(31–46 Nm).
- Install a new turbocharger gasket onto the exhaust manifold, then carefully
guide the turbo over the mounting studs and onto the gasket. Install the mounting
nuts/lockwashers. Torque the mounting nuts to 33–40 ft. lbs. (45–54
Nm). Once the nuts are torqued, crimp the tabs on the nut retaining plate
to prevent the nuts from loosening. Remove the protective covers from the
turbo openings.
- Connect the front converter to the turbocharger with a new gasket. Torque
the nuts to 33–40 ft. lbs. (45–54 Nm).
- Install the remaining components in reverse of the removal procedure. Install
a new gasket for any part requiring one:
- Insulator covers
- Oil pipes
- Water pipe and water hose
- Split air pipe
- Air control valve
- Air funnel and air hose
- Air pump and air hoses
- Fill the cooling system to the proper level with a suitable coolant mixture
and connect the negative battery cable.
- Start the engine and check for leaks. Make all necessary adjustments.
![Next](next.gif)